Marshall High School
Bend, Oregon
A three building, 20,000 square foot remodel and new construction project. The existing school was remodeled and two new
buildings were constructed. All of the structures were designed with wood framing including the fourteen foot overhangs that
cover the exterior walkways around the building. This project was completed in 2004.
Architect: Dull Olson Weekes Architects
|